Total research funding I've been involved with for the DOC group since June 1995 is $26,810,443. This funding can be split into two categories:

A detailed breakdown of the sources of funding is presented below:
  1. "Applications of Reliable, Fast Event Notification," Raytheon, 6/1/2008 to 5/30/2009, $60,000.

  2. "Open Modular Embedded Architectures," General Electric Global Research, 8/1/2008 to 1/31/2009, $35,000.

  3. "Analysis and Simulation Techniques for Next-generation Motion Control Systems," Aagard, 8/1/2008 to 1/31/2009, $13,850 with Akos Ledeczi.

  4. "Open Modular Embedded Architectures," Raytheon, 8/1/2008 to 3/31/2009, $74,276.

  5. ``NAOMI,'' LMCO Advanced Technology Lab, 9/1/2007 to 11/30/2009, $290,000.

  6. ``IU/CRC Membership,'' Siemens, 1/1/2009 to 12/31/2009, $40,000.

  7. "Enterprise Application Configuration in the Context of Model Driven Software Development and Software Factories," Siemens Corporate Research, 10/1/07 to 9/31/08 $91,798.

  8. ``Modular Extendable Demonstration of an Upgradeable Space Architecture (MEDUSA),'' DARPA (subcontract through Lockheed Martin Advanced Technology Center), 2/1/2008 to 1/31/2011, $600,000.

  9. ``CCM Middleware Implementation and Integration,'' PrismTech, 6/8/2007 to 3/31/2007, $33,778.

  10. ``The Smart Sensor Web Architecture,'' NASA (subcontract through Lockheed Martin Advanced Technology Center), 12/15/06 to 11/14/09, $467,728, co-PI G. Biswas.

  11. ``Systems and Software PRodUcibility Collaboration and Experimentation Environment (S2PRUCE2),'' AFRL (subcontract through Lockheed Martin Advanced Technology Lab), 2/1/07 to 1/31/10, $300,000.

  12. ``IU/CRC Membership,'' General Motors, 1/1/2008 to 12/31/2009, $100,000, co-PI G. Karsai.

  13. ``Team for Research in Ubiquitous Secure Technology (TRUST),'' NSF (subcontract through UC Berkeley), 6/1/05 to 5/31/10, $3,200,000, co-PI(s) J. Sztipanovits and G. Karsai.

  14. ``Pollux: Enhanding the Real-time QoS of the Global Information Grid,'' AFRL, 2/24/06 to 7/24/08, $1,242,718, co-PI M. Reiter.

  15. ``Intelligent Middleware for Next Generation Petascale Scientific Computing,'' Vanderbilt Discover Grant, 5/1/05 to 6/30/07, $100,000, co-PI(s) A. Gokhale and P. Sheldon.

  16. ``Air Force Center for Research on GIG/NCES Challenges,'' AFOSR (subcontract through UC Berkeley), 3/1/06 to 2/28/08, $600,000, co-PI J. Sztipanovits.

  17. ``Quality of Service Enabled Dissemination,'' AFRL (subcontract through BBN Technologies), 12/31/2007 to 9/30/2009, $320,000.

  18. ``A Fault-Tolerant Real-Time CORBA Naming Service,'' US Navy (subcontract through Tech-X Corp), 11/1/2007 to 4/30/2010, $175,000, co-PI A. Gokhale.

  19. ``System Execution Modeling Technologies for Large-scale Net-centric Systems,'' AFRL, 1/1/2008 to 12/31/2010, $244,000.

  20. ``Model-Driven Computing for Distributed Real-time Embedded Systems,'' Raytheon, 8/31/04 to 8/31/08, $500,000.

  21. ``ACE/TAO Improvement Techniques and Solutions, Veritas/Symantec, 3/31/05 to 4/31/08, $198,500.

  22. ``Adaptive Resource Control for Certificable Systems,'' DARPA (subcontract through LMCO Advanced Technology Lab), 3/30/2007 to 12/31/2007, $50,000.

  23. ``Survivable Internet-scale Distributed Systems,'' IDA, 3/30/2007 to 12/31/2007, $60,000.

  24. ``QUality of service pICKER (QUICKER),'' LMCO Advanced Technology Lab, 3/30/2007 to 12/31/2007, $60,000.

  25. ``Thimble,'' LMCO Advanced Technology Lab, 3/30/2007 to 12/31/2007, $60,000.

  26. ``CADynCE Experimentation Operations (CEO),'' DARPA (subcontract through LMCO Advanced Technology Lab), 8/31/2007 to 12/31/2007, $25,000.

  27. ``Real-time Discovery for Pub/Sub Middleware in WANs,'' US Navy (subcontract through Tech-X Corp), 6/16/2007 to 9/31/2007, $15,000.

  28. ``GEMS Utilization Test Suite,'' LMCO Advanced Technology Lab, 9/1/07 to 11/30/07, $50,000.

  29. ``Advanced Information Systems and Technology Program,'' NASA (subcontract through LMCO Advanced Technology Center), 11/13/2007 to 12/1/2007, $22,000, co-PI G. Biswas.

  30. ``Design for Adaptivity and Reliable Operation of Software Intensive Systems,'' NSF CNS-0613971, 9/1/06 to 8/31/08, $199,867, co-PI(s) S. Abdelwahed and G. Karsai.

  31. ``Software Technologies Targeting Interoperability for Systems of Systems,'' Army Research Lab, 1/15/07 1/14/10, $851,567, co-PI(s) G. Karsai and J. Sztpanovits.

  32. ``Software Wind Tunnel (SWiT) Capabilities,'' Lockheed Martin Advanced Technology Lab, 8/1/06 to 12/31/06, $60,000.

  33. ``High-Confidence Software Platforms for Cyber-Physical Systems,'' NSF, 5/1/06 to 7/30/08, $129,179.

  34. ``Applying AOP to Develop of Component Synthesis with MDD,'' Siemens, 3/1/03 to 2/28/07, $400,005.

  35. ``Addressing Domain Evolution Challenges in Model-Driven Software Product-lines,'' Siemens Corporate Research, 10/1/05 9/31/07, $100,000.

  36. ``A Fault Tolerant Real-time CORBA Naming Service,'' US Navy (subcontract through Tech-X Corp), 11/1/05 to 8/31/06, $15,000.

  37. ``The SYstem DEployment and Configuration AssisteR (SYDECAR),'' Lockheed Martin Advanced Technology Lab, 8/1/05 to 8/1/08, $500,000.

  38. ``Future Combat Systems: Software Architecture Engineering,'' DARPA (subcontract through Boeing), 1/28/05 to 12/31/07, $2,764,226, co-PI(s) J. Sztipanovits and G. Karsai.

  39. ``Development of an Eclipse Plug-in,'' PrismTech, 4/28/05 to 9/30/05, $25,000.

  40. ``Prometheus: Enhancing the QoS of the JBI,'' AFRL, 3/25/05 to 12/31/05, $500,000, co-PI(s) K. Birman and Mike Reiter.

  41. ``A Testbed for Assuring Quality of Software for DRE Systems,'' ONR, 2/15/05 to 1/31/06, $200,000, co-PI(s) A. Gokhale and A. Porter.

  42. ``Enhancing the QoS of SOAs Using Eclipse-based MDD,'' IBM, 2/15/05 to 1/31/06, $29,515, co-PI A. Gokhale.

  43. ``Model-Driven Development of BEEP Application Protocols,'' Cisco, 12/15/04 to 12/14/05, $57,976, co-PI A. Gokhale.

  44. ``Evaluating CORBA Middleware for Space Systems,'' NASA (subcontract through Lockheed Martin Advanced Technology Center), 9/23/04 to 11/30/06, $186,180, co-PI G. Biswas.

  45. ``Refactoring Techniques to Reduce Middleware Resource Utilization,'' Qualcomm, 10/31/04 to 10/31/05, $104,000, co-P B. Natarajan.

  46. ``Model-Driven Development for Software Defined Radios,'' BAE Systems, 12/1/04 to 3/31/05, $32,000.

  47. ``Enhancing the Robustness and Performance of TENA,'' DISA (subcontract through SAIC and OSC), 7/1/04 to 12/31/04, $75,000.

  48. ``QoS-enabled Fault Tolerant Middleware and MDA Tools,'' Lockheed Martin MSS, 4/1/03 to 12/31/04, $516,434.

  49. ``Trustworthiness in Embedded Systems,'' NSF ITR CCR-032574, 9/31/03 to 8/31/06, $210,454.

  50. ``ACE+TAO Enhancements,'' OCI, gift $20,000.

  51. ``Acquiring Accurate Dynamic Field Data Using Lightweight Instrumentation,'' NSF ITR CCR-0312859, 10/1/02 to 9/31/07, $1,850,000, co-PI(s) A. Porter, D. Notkin, and A. Karr.

  52. ``Intergovernmental Personnel Act,'' DARPA, 6/1/00 to 5/31/02, $198,934.

  53. ``Optimizing Component Models,'' DARPA, 4/1/01 to 6/31/02, $210,000.

  54. ``HLA RTI Next-generation,'' DMSO (subcontract through SAIC), 6/1/01 to 12/31/01, $70,895.

  55. ``ACE Enhancements for Windows NT and Windows CE,'' Siemens Medical Engineering, 2/1/00 9/19/01, $112,000.

  56. ``Scalable and Fault Tolerant Middleware,'' AFRL MURI, 12/1/99 to 3/31/02, $253,701.

  57. ``Protocol Engineering Research Center,'' AFSOR MURI, 6/15/00 to 6/14/03, $264,720, co-PI Tatsuya Suda.

  58. ``Optimizing ORBs for Network Management,'' Cisco Systems, 1/1/00 to 12/31/00, $100,000.

  59. ``TAO Optimizations,'' Raytheon, 10/1/99 to 6/01/01, $50,000.

  60. ``ACE+TAO on pSoS,'' Motorola, 8/15/99 to 12/31/99, $30,000.

  61. ``Real-time Distributed Object Computing,'' Sprint, 8/15/99 8/14/00, $133,068.

  62. ``TAO Enhancements,'' Krones, 8/1/99 to 9/1/99, $5,000.

  63. ``ACE Enhancements,'' ICOMVERSE, gift, $20,000.

  64. ``Weapon Systems Open Architecture,'' Boeing, 7/15/99 to 1/31/00, $51,491.

  65. ``Fault Tolerant CORBA,'' Motorola Labs, 7/15/99 to 7/14/00, $139,000.

  66. ``TAO Enhancements,'' Global MAINTECH, 7/1/99 to 8/1/99, $5,000.

  67. ``ACE QoS Extensions,'' Motorola Trunking, 6/1/99 to 8/1/99, $5,000.

  68. ``CORBA Interceptors,'' Experian, 5/15/99 7/14/99, $10,000.

  69. ``DCOM performance evaluation,'' Microsoft, gift, $30,000.

  70. ``TAO Improvements,'' OCI, 4/1/99 to 9/31/00, $27,000.

  71. ``Middleware Optimizations,'' Telcordia, 2/1/99 to 1/31/00, $52,700.

  72. ``Minimum CORBA,'' Hughes Data Networking, 4/1/99 to 3/31/00, $50,000, co-PI David Levine.

  73. ``Framework Usage Patterns,'' Siemens Corporate Research, 4/1/99 to 3/31/00, $35,000.

  74. ``Dynamic Scheduling and Real-time ORB Optimizations,'' Boeing, 10/1/98 9/30/99, $184,860.

  75. ``Distributed Object Computing Middleware,'' Nortel, 11/1/98 10/31/99, $75,000.

  76. ``ACE subsetting,'' ``ACE subsetting,,'' Nokia, 10/8/98 4/8/99, $30,000.

  77. ``Boeing Research Fellowship,'' Boeing, 9/1/98 8/31/00, $81,486.

  78. ``Patterns and Frameworks Reuse Curriculum,'' Lucent Bell Labs, 9/1/98 12/31/98, $31,200.

  79. ``Patterns, Frameworks, and Components,'' Siemens ZT, 12/1/98 5/31/00, $175,000.

  80. ``High availability frameworks,'' Lucent, 9/1/98 8/31/99, $39,400.

  81. ``Real-time Distributed Object Computing,'' Sprint, 8/1/98 7/31/99, $288,194.

  82. ``Distributed Object Integration for the Quorum Project,'' DARPA S30602-98-C-0187 (subcontract through BBN), 9/1/98 8/31/01, $448,643, co-PI(s) R. Schantz and J. Loyall.

  83. ``Evaluating a Framework for Dynamic Distributed Real-Time Scheduling,,'' USENIX, gift, $18,000.

  84. ``Distributed Object Computing,'' Microsoft, gift, $20,000.

  85. ``Distributed Object Visualization Environment,'' Lockheed Martin, 5/1/98 to 11/31/99, $54,000.

  86. ``Distributed Object Computing with Adaptive End-to-end QoS Guarantees,'' DARPA 9701561, 8/1/97 to 7/31/00, $873,625.

  87. ``Real-time CORBA for Telecommunications,'' Lucent, 12/1/97 to 11/31/98, $100,000.

  88. ``Developing an HLA-compliant RTI with ACE,'' SAIC, 12/15/97 to 1/31/00, $228,075.

  89. ``Real-time CORBA for Wireless,'' Motorola LMPS, 10/15/97 to 10/14/98, $200,000.

  90. ``Real-time CORBA for Avionics,'' Computing Devices International, 10/15/97 to 10/14/98, $39,050.

  91. ``Dynamic Scheduling of Real-time OFPs,'' Boeing, 9/1/97 to 8/31/98, $224,604.

  92. ``Distributed Object Visualization,'' Siemens MED, 10/1/97 to 9/1/98, $40,000.

  93. ``The ADAPTIVE Communication Environment,'' Siemens MED, 10/1/97 to 9/1/98, $70,000.

  94. ``The Architect's Assistant,'' Siemens Corporate Research, 9/1/97 to 8/1/98, $35,000.

  95. ``Monitoring, Visualization, and Control of High Speed Networks,'' NSF NCR-97-14698, 9/1/97 to 8/31/01, $1,200,000, co-PI(s) G. Parulkar, E. Kraemer, J. Turner, and R. Cytron .

  96. ``Adaptive Software Technology Demonstration (ASTD),'' AFRL (subcontract through Boeing), 9/1/98 to 8/31/02, $1,200,000, co-PI(s) B. Doerr, D. Allen, and R. Jha.

  97. ``Patterns, Frameworks, and Components for Multimedia Systems,'' Siemens Research, 1/97 to 6/98, $150,000.

  98. ``Adaptive Servers for High-Performance Imaging,'' Kodak Networked Imaging Tech. Center, 11/96 to 11/97, $40,000.

  99. ``Real-time CORBA,'' Sprint, 9/96 to 12/97, $345,000, co-PI G. Parulkar.

  100. ``OpenMAP -- Object-Oriented Components for Real-time Avionics,'' McDonnell Douglas, 9/96 to 9/97, $241,591.

  101. ``Compilation and Automatic Optimization of Network Protocol Implementations,'' NSF NCR-9628218, 8/96 to 8/99, $411,025, co-PI(s) G. Varghese and R. Cytron (PI).

  102. ``Medical Imaging with Java and the WWW,'' SIEMENS Medical Engineering, 8/96 to 7/97, $125,000.

  103. ``The ADAPTIVE Communication Environment,'' SIEMENS Medical Engineering, 8/96 to 7/97, $90,000.

  104. ``High-performance Distributed Medical Imaging,'' Kodak Imaging, 12/94 to 8/96, $55,152, co-PI J. Blaine.

  105. ``Design Patterns for Concurrent Object-Oriented Networking,'' Object Technologies International, 4/96 to 4/97, $25,000.

  106. ``Distributed Object Computing with CORBA and DCE,'' Bellcore, 5/96 to 12/96, $32,978.

  107. ``The ADAPTIVE Communication Environment,'' SIEMENS Medical Engineering, 6/95 to 6/96, $170,000.